Load Flow Study Made Simple | The Iteration Process

Equipment selection and specification is a basic requirement in the design of any electric power system. Typically, this starts with the determination of the system steady state operating conditions through a load flow study.

For the calculation of short-circuit duties, click here.

Prior to commissioning of an electric power system, what is known are only the resistance and reactance of the lines, the loads connected, and an assumption of the voltage at the sending end.

The Iteration Process of Load Flow Study

From figure 1, V1, Z, and S2 are known. This leaves us with V2. As an example, suppose that we have a load of S2 = 1.5 ∠0 pu, a line impedance of Z = 0.05 ∠0 pu, and assuming that the voltage at the sending end, V1 = 1 ∠0 pu, solving for V2 using the equation presented above will require an iteration process.

Figure 1

Initial Value (Assumption)

V2(0) = 1∠0 pu


1st Iteration

V2 (1)= 1∠0  – 0.05∠0(1.5∠0/1∠0)* = 0.925 pu

2nd Iteration

V2 (2)=1∠0-0.05∠0(1.5∠0/0.925∠0)* = 0.91892 pu

3rd Iteration

V2 (3)=1∠0-0.05∠0(1.5∠0/0.91892∠0)*= 0.91838 pu

4th Iteration

V2 (4)=1∠0-0.05∠0(1.5∠0/0.91838∠0)*= 0.91833 pu

5th Iteration

V2 (5)=1∠0-0.05∠0(1.5∠0/0.91833∠0)*= 0.91833 pu

Solving for I,

I = (V1 – V2)/Z = (1 – 0.91833)/0.05 = 1.6334 pu

This is just a simple illustration of how the iteration process is done in a load flow study. For more complex systems, methods such as Newton-Raphson or Gauss-Seidel is used. Manual calculations can be quite complex and time consuming that is why using computer-aided simulation software such as ETAP and others related software is preferred.

The results of the load flow study will become the basis in the selection and specification of continuous current rating, cable ampacity, transformer rating and tap position, capacitor bank rating among others, and the optimization of system operating conditions.

pacbasics

View Comments

Share
Published by
pacbasics
Tags: load flow

Recent Posts

2 Key Metrics in Overcurrent Protection: Why Time-Current Curves and Coordination Time Intervals Matter More Than You Think

TCC and CTI are the two most common acronyms in overcurrent protection coordination. Understanding Time-Current…

4 weeks ago

Transformer Tertiary Winding Basic Application

Tertiary winding in transformers have been widely used in the transmission and distribution of electricity…

5 years ago

How Do Reclosers Work? Settings and Operation

Photo Credit: NOJA Power Reclosers, otherwise known as autoreclosers (derived from "automatic reclosing" capability) or…

5 years ago

Impedance-Based Fault Location | A Step-by-Step Guide

Impedance-based fault location is widely used throughout the power transmission and distribution industry. In fact,…

5 years ago

Distance Relaying Fundamentals | What is Apparent Impedance?

In our introductory article on distance relaying, we presented a simple apparent impedance calculation for…

5 years ago

ETAP Star Coordination on Focus | Detailed Example

The main objective of any protection system is to interrupt short-circuits as fast as possible.…

6 years ago